Large Renovation Project, North London

Jan 20 2020

Large Renovation Project, North London   November, 2019

This large renovation project, first brought to us in 2014, required a complete system for boosting cold water over 3 floors to 6 bathrooms. Our sister company, Smart Showers, was also asked to provide a steam shower system for the master bathroom for which a Charade 800 wetroom head was provided.

With large scale shower heads as well as standard water outlets to pressurise, the Pump World team specified and supplied a Smartpro Twin Pump Set, 6.0 Bar Hot Water Cylinder, Two Piece Break Tank with Raised Ball Valve Chamber and Water Treatment solutions. The pump set was also commissioned on site to ensure a reliable, quality installation within the manufacturer's warranty.

  For a true drench shower, look no further than the Italian made Charade. 80cm of edge to edge nozzles, in a slim-line design for smart water distribution without compromising on performance." 

- The Smart Showers Team  |  
www.smartshowers.co.uk 

 

 

 

Large Renovation Project, North London   November 2019



This large renovation project, first brought to us in 2014, required a complete system for boosting cold water over 3 floors to 6 bathrooms. Our sister company, Smart Showers, was also asked to provide a steam shower system for the master bathroom for which a Charade 800 wetroom head was provided.

With large scale shower heads as well as standard water outlets to pressurise, the Pump World team specified and supplied a Smartpro Twin Pump Set, 6.0 Bar Hot Water Cylinder, Two Piece Break Tank with Raised Ball Valve Chamber and Water Treatment solutions. The pump set was also commissioned on site to ensure a reliable, quality installation within the manufacturer's warranty.

  For a true drench shower, look no further than the Italian made Charade. 80 cm of edge to edge nozzles, in a slim-line design for smart water distribution without compromising on performance." 

- The Smart Showers Team  |  
www.smartshowers.co.uk 

 

Large Renovation Project, North London   November 2019



This large renovation project, first brought to us in 2014, required a complete system for boosting cold water over 3 floors to 6 bathrooms. Our sister company, Smart Showers, was also asked to provide a steam shower system for the master bathroom for which a Charade 800 wetroom head was provided.

With large scale shower heads as well as standard water outlets to pressurise, the Pump World team specified and supplied a Smartpro Twin Pump Set, 6.0 Bar Hot Water Cylinder, Two Piece Break Tank with Raised Ball Valve Chamber and Water Treatment solutions. The pump set was also commissioned on site to ensure a reliable, quality installation within the manufacturer's warranty.

  For a true drench shower, look no further than the Italian made Charade. 80 cm of edge to edge nozzles, in a slim-line design for smart water distribution without compromising on performance." 

- The Smart Showers Team  |  
www.smartshowers.co.uk 

Total: 0 Comment(s)


 
telephone

01793 820142

Monday - Friday, 9am - 5pm

 

 



 
pump solve &

specification

Advice and recommendations

 

 



 
fast identification

email a photo

ID for direct or nearest match. 

 

 







about us 

Pump World's philosophy is to provide quality pump solutions that are energy saving and low on noise without compromising on performance. 

The Pump World team are here to help you put together the right boosting equipment to optimise your system. Our sister company, Smart Showers, sources the finest Italian shower design for a luxury bathroom experience.

Together, Pump World and Smart Showers provide an all-encompassing system solution - designed to suit you.

Pump World   A limited company, registered in England.
Company Number : 02433506.  Registered At : Unit 11 Woodside Road, Swindon, SN3 4WA.

 

payment methods

           

Text/HTML