latest news  

latest news  

latest news  

Boosting A Jacobean Manor, Wareham

Mar 03 2023
3
0

 

 

 

 

 

 

 

Boosting a Jacobean Manor, Wareham   

Pump World were approached to provide a Systempro boosting solution for a Grade I listed heritage building built in the 1600s.

The property had an anticipated occupancy of up to 15 people, boosting over 3 floors to multiple bathrooms and utilities.

Pump World’s technical team specified a bespoke break tank to suit the limited space, a rapid recovery hot water cylinder for fast water heating and a Smartpro Twin variable speed pump set which offers precise speed control, quiet operation and reduced running costs.

Once installation was completed, a commissioning service was provided by a manufacturer accredited engineer to check and tune the pump set. A highly recommended service to provide peace of mind for your installation.

This was a long-running project with multiple stages within the specification process to balance the limitations of the period property with the demands of  modern day use. Our specification service is highly flexible to ensure the best solution to suit you and your property.

 

 

Boosting a Jacobean Manor, Wareham   

Pump World were approached to provide a Systempro boosting solution for a Grade I listed heritage building built in the 1600s.

The property had an anticipated occupancy of up to 15 people, boosting over 3 floors to multiple bathrooms and utilities.

Pump World’s technical team specified a bespoke break tank to suit the limited space, a rapid recovery hot water cylinder for fast water heating and a Smartpro Twin variable speed pump set which offers precise speed control, quiet operation and reduced running costs.

Once installation was completed, a commissioning service was provided by a manufacturer accredited engineer to check and tune the pump set. A highly recommended service to provide peace of mind for your installation.

This was a long-running project with multiple stages within the specification process to balance the limitations of the period property with the demands of  modern day use. Our specification service is highly flexible to ensure the best solution to suit you and your property.

 

Boosting a Jacobean Manor, Wareham   

Pump World were approached to provide a Systempro boosting solution for a Grade I listed heritage building built in the 1600s.

The property had an anticipated occupancy of up to 15 people, boosting over 3 floors to multiple bathrooms and utilities.

Pump World’s technical team specified a bespoke break tank to suit the limited space, a rapid recovery hot water cylinder for fast water heating and a Smartpro Twin variable speed pump set which offers precise speed control, quiet operation and reduced running costs.

Once installation was completed, a commissioning service was provided by a manufacturer accredited engineer to check and tune the pump set. A highly recommended service to provide peace of mind for your installation.

This was a long-running project with multiple stages within the specification process to balance the limitations of the period property with the demands of  modern day use. Our specification service is highly flexible to ensure the best solution to suit you and your property.

 

Tank Clean & Sterilisation, Bournemouth

Aug 25 2022
0
0

 

 

Tank Clean & Sterilisation, Bournemouth    Aug, 2022

Pump World were approached to provide a full system solution for water pressure boosting in a large 20 room hotel. As well as product supply, Pump World also provides servicing options.

Once the large tank had been installed it was important to ensure a clean water supply that would meet current water regulations and maximise the life of the storage tank.

Tank inspection, cleaning and chlorination of a tank and its services is recommended on an annual basis. For more information, please do contact our office on 01793 820142.

 

 

 

Tank Clean & Sterilisation, Bournemouth    Aug, 2022

Pump World were approached to provide a full system solution for water pressure boosting in a large 20 room hotel. As well as product supply, Pump World also provides servicing options.

Once the large tank had been installed it was important to ensure a clean water supply that would meet current water regulations and maximise the life of the storage tank.

Tank inspection, cleaning and chlorination of a tank and its services is recommended on an annual basis. For more information, please do contact our office on 01793 820142.

 

Tank Clean & Sterilisation, Bournemouth    Aug, 2022

Pump World were approached to provide a full system solution for water pressure boosting in a large 20 room hotel. As well as product supply, Pump World also provides servicing options.

Once the large tank had been installed it was important to ensure a clean water supply that would meet current water regulations and maximise the life of the storage tank.

Tank inspection, cleaning and chlorination of a tank and its services is recommended on an annual basis. For more information, please do contact our office on 01793 820142.

 

Boosting a Large Apartment, July 2022

Jul 07 2022
0
0

 

 

 

 

 

 

 

 

 

Boosting Large Apartment, Surrey    July, 2022

In July 2022, we replaced two obsolete pumps in a high demand apartment in Surrey.

The obsolete pumps had been superceded with efficient motors and digital inverters which offer enhanced performance, LED displays and more cost efficient running.  

Our technical team were on hand to offer installation and advice to the plumber on site who had not fitted the pumps before, and had to connect two pumps together to work in duty assist.

Our technical team have the experience and product know-how to help you select and install the correct pump for the application. If you would like assistance, complete our SPECIFY form, or contact our team on 01793 820142.

  Pump World supplied me with two pumps for use in my second storey apartment. The technical support they provided to my plumber when he was installing the pumps was first class. My plumber said he certainly could not have completed the job without the support given.

- Simon, End User

 

 

Boosting Large Apartment, Surrey    July, 2022

In July 2022, we replaced two obsolete pumps in a high demand apartment in Surrey.

The obsolete pumps had been superceded with efficient motors and digital inverters which offer enhanced performance, LED displays and more cost efficient running.

Our technical team were on hand to offer installation and advice to the plumber on site who had not fitted the pumps before, and had to connect two pumps together to work in duty assist.

Our technical team have the experience and product know-how to help you select and install the correct pump for the application. If you would like assistance, complete our SPECIFY form, or contact our team on 01793 820142.

    Pump World supplied me with two pumps for use in my second storey apartment. The technical support they provided to my plumber when he was installing the pumps was first class. My plumber said he certainly could not have completed the job without the support given.

- Simon, End User

 

Boosting Large Apartment, Surrey    July, 2022

In July 2022, we replaced two obsolete pumps in a high demand apartment in Surrey.

The obsolete pumps had been superceded with efficient motors and digital inverters which offer enhanced performance, LED displays and more cost efficient running.

Our technical team were on hand to offer installation and advice to the plumber on site who had not fitted the pumps before, and had to connect two pumps together to work in duty assist.

Our technical team have the experience and product know-how to help you select and install the correct pump for the application. If you would like assistance, complete our SPECIFY form, or contact our team on 01793 820142.

    Pump World supplied me with two pumps for use in my second storey apartment. The technical support they provided to my plumber when he was installing the pumps was first class. My plumber said he certainly could not have completed the job without the support given.

- Simon, End User

 

Boosting a Historic Apartment Block, Esher

Jul 04 2022
1
0

 

 

Boosting a Historic Apartment Block, Esher    Feb, 2022

As part of a wide-scale renovation project of an iconic apartment block in Esher, Surrey, Pump World was contacted to design and supply a complete system to boost the block’s water pressure.

The system needed to pump over 5 floors to 26 showers, 26 basins, 25 sinks, and 26 WCs.

Pump World’s technical team designed a system including a large GRP break tank (pictured), a high quality three pump booster set, and a Boosterpack 50 mains boosting set (used to boost the outside tap).

 

 

Boosting a Historic Apartment Block, Esher    Feb, 2022

As part of a wide-scale renovation project of an iconic apartment block in Esher, Surrey, Pump World was contacted to design and supply a complete system to boost the block’s water pressure.

The system needed to pump over 5 floors to 26 showers, 26 basins, 25 sinks, and 26 WCs.

Pump World’s technical team designed a system including a large GRP break tank (pictured), a high quality three pump booster set, and a Boosterpack 50 mains boosting set (used to boost the outside tap).

Boosting a Historic Apartment Block, Esher    Feb, 2022

As part of a wide-scale renovation project of an iconic apartment block in Esher, Surrey, Pump World was contacted to design and supply a complete system to boost the block’s water pressure.

The system needed to pump over 5 floors to 26 showers, 26 basins, 25 sinks, and 26 WCs.

Pump World’s technical team designed a system including a large GRP break tank (pictured), a high quality three pump booster set, and a Boosterpack 50 mains boosting set (used to boost the outside tap).

Boosting Large Townhouse, London

Dec 04 2021
3
0

 

 

 

 

 

 

 

Boosting a Large Townhouse, London    Dec, 2020

In February 2020, Pump World was asked to size a system for a large domestic property in London.

The system needed to pump over 3 floors to bathroom and utilities with hot and cold water storage to suit demand. Water treatment was also requested.

Pump World’s technical team specified a modular break tank with insulation and a tank protection cartridge for cold water storage, a bespoke hot water cylinder with secondary circulator, a variable speed Smartpro pump set with variable speed to ensure quiet running and reduced running costs and a timed water softener to reduce limescale.

All components of the system were supplied with ready-assembled installation kits to protect and maintain the system whilst ensuring a fast installation for the contractor.

  I've bought many pumped systems from Pump World and they have all worked well. They really help with their technical backup and have always been easy to get hold of.

- Frank, Contractor

 

 

Boosting a Large Townhouse, London    Dec, 2020

In February 2020, Pump World was asked to size a system for a large domestic property in London.

The system needed to pump over 3 floors to bathroom and utilities with hot and cold water storage to suit demand. Water treatment was also requested.

Pump World’s technical team specified a modular break tank with insulation and a tank protection cartridge for cold water storage, a bespoke hot water cylinder with secondary circulator, a variable speed Smartpro pump set with variable speed to ensure quiet running and reduced running costs and a timed water softener to reduce limescale.

All components of the system were supplied with ready-assembled installation kits to protect and maintain the system whilst ensuring a fast installation for the contractor.



  I've bought many pumped systems from Pump World and they have all worked well. They really help with their technical backup and have always been easy to get hold of.

- Frank, Contractor

 

Boosting a Large Townhouse, London    Dec, 2020

In February 2020, Pump World was asked to size a system for a large domestic property in London.

The system needed to pump over 3 floors to bathroom and utilities with hot and cold water storage to suit demand. Water treatment was also requested.

Pump World’s technical team specified a modular break tank with insulation and a tank protection cartridge for cold water storage, a bespoke hot water cylinder with secondary circulator, a variable speed Smartpro pump set with variable speed to ensure quiet running and reduced running costs and a timed water softener to reduce limescale.

All components of the system were supplied with ready-assembled installation kits to protect and maintain the system whilst ensuring a fast installation for the contractor.



  I've bought many pumped systems from Pump World and they have all worked well. They really help with their technical backup and have always been easy to get hold of.

- Frank, Contractor

 

Quiet Pump Required, Cambridge

Jul 05 2021
5
0

 

 

 

 

 

 

Quiet Pump Required, Cambridge    July, 2021

We were asked to provide a quotation for a universal twin shower pump, 2.0 Bar, with exceptionally quiet running.

Pump World’s technical team recommended a Supergen N80TX - a high quality, UK made shower pump with brass construction and continuously rated induction motor. This increases the life of the pump and decreases the noise level. The brass is cast so it is much thicker than standard stamped brass alternatives, and uniquely machined for smooth water flow. This pump is extremely quiet running and WRAS Approved. Supplied with 1.5 m mains cable and stainless steel braided hoses.

  Please pass on my thanks to the team and especially the gentleman on the technical help desk. I am over the moon with this pump, great product and super quiet which was the main reason for purchase. Very happy, many thanks again.

- Mike, Contractor

 

 

Quiet Pump Required, Cambridge    July, 2021

We were asked to provide a quotation for a universal twin shower pump, 2.0 Bar, with exceptionally quiet running.

Pump World’s technical team recommended a Supergen N80TX - a high quality, UK made shower pump with brass construction and continuously rated induction motor. This increases the life of the pump and decreases the noise level. The brass is cast so it is much thicker than standard stamped brass alternatives, and uniquely machined for smooth water flow. This pump is extremely quiet running and WRAS Approved. Supplied with 1.5 m mains cable and stainless steel braided hoses.

  Please pass on my thanks to the team and especially the gentleman on the technical help desk. I am over the moon with this pump, great product and super quiet which was the main reason for purchase. Very happy, many thanks again.

- Mike, Contractor

 

Quiet Pump Required, Cambridge    July, 2021

We were asked to provide a quotation for a universal twin shower pump, 2.0 Bar, with exceptionally quiet running.

Pump World’s technical team recommended a Supergen N80TX - a high quality, UK made shower pump with brass construction and continuously rated induction motor. This increases the life of the pump and decreases the noise level. The brass is cast so it is much thicker than standard stamped brass alternatives, and uniquely machined for smooth water flow. This pump is extremely quiet running and WRAS Approved. Supplied with 1.5 m mains cable and stainless steel braided hoses.

  Please pass on my thanks to the team and especially the gentleman on the technical help desk. I am over the moon with this pump, great product and super quiet which was the main reason for purchase. Very happy, many thanks again.

- Mike, Contractor

 

Boosting an Irrigation System, Bristol

Oct 22 2020
3
0

Boosting an Irrigation System, Bristol   October, 2020

We were approached to specify a mains boosting set with additional spares to supply an irrigation system. Pump World’s technical team recommended the Smart-box Tank Set CAT5  as well as an insulation jacket, hose, hose accessories, and a lever ball valve.

  This was a good install to a store room behind a concierge desk of a housing development. The pump was required to supply an irrigation system. We strongly advised the client to use this model as it has such a quiet motor and being so close to the main desk. The install required us to add extra power outlet (13amp spur) plus an outside socket. The water inlet was straight forward and all lagged. The waste overflow, which feeds from the back of this unit has been hidden behind shelves and into the drain. The outlet pipe had to snake up the wall and through an old thick wall to ground level to where we fitted a 1" lever tap for the irrigation system to hook up to. The client has commented that the pump can't be heard from the desk area. Overall, the service we had from Pump World was very professional and efficient. The help we received from Nigel was very beneficial, as was Francesca." 

- David, Projects Manager at Tradeline 

 

 

 

Boosting an Irrigation System, Bristol   October 2020



We were approached to specify a mains boosting set with additional spares to supply an irrigation system. Pump World’s technical team recommended the Smart-box Tank Set CAT5  as well as an insulation jacket, hose, hose accessories, and a lever ball valve.


  This was a good install to a store room behind a concierge desk of a housing development. The pump was required to supply an irrigation system. We strongly advised the client to use this model as it has such a quiet motor and being so close to the main desk. The install required us to add extra power outlet (13amp spur) plus an outside socket. The water inlet was straight forward and all lagged. The waste overflow, which feeds from the back of this unit has been hidden behind shelves and into the drain. The outlet pipe had to snake up the wall and through an old thick wall to ground level to where we fitted a 1" lever tap for the irrigation system to hook up to. The client has commented that the pump can't be heard from the desk area. Overall, the service we had from Pump World was very professional and efficient. The help we received from Nigel was very beneficial, as was Francesca." 

- David, Projects Manager at Tradeline     

 

Boosting an Irrigation System, Bristol   October 2020



We were approached to specify a mains boosting set with additional spares to supply an irrigation system. Pump World’s technical team recommended the Smart-box Tank Set CAT5  as well as an insulation jacket, hose, hose accessories, and a lever ball valve.


  This was a good install to a store room behind a concierge desk of a housing development. The pump was required to supply an irrigation system. We strongly advised the client to use this model as it has such a quiet motor and being so close to the main desk. The install required us to add extra power outlet (13amp spur) plus an outside socket. The water inlet was straight forward and all lagged. The waste overflow, which feeds from the back of this unit has been hidden behind shelves and into the drain. The outlet pipe had to snake up the wall and through an old thick wall to ground level to where we fitted a 1" lever tap for the irrigation system to hook up to. The client has commented that the pump can't be heard from the desk area. Overall, the service we had from Pump World was very professional and efficient. The help we received from Nigel was very beneficial, as was Francesca." 

- David, Projects Manager at Tradeline     

Kitchen Tap Boosting, Suffolk

Jul 23 2020
0
0

Kitchen Tap Boosting, Suffolk   July, 2020

We were approached to specify a pump to boost hot water in a bungalow.

Pump World’s technical team recommended a Supergen 15SX - a cost effective, regenerative unit with a specially designed single impeller that aids the removal of air generated in the system. Low speed (1450 rpm) induction motor and anti-vibration rubber feet reduce transmitted noise. This pump is extremely quiet running and WRAS Approved. Supplied with 1.5 m mains cable and stainless steel braided hoses.

  Technically very helpful in understanding complex water flow problems. The pump was fitted this morning...impressively quiet...hot water now reaches the sink in one minute with full flow, previously it was 2 minutes 45 seconds with a slow flow! Thanks for all your help." 

- Jonathan, End User 

 

 

 

Kitchen Tap Boosting, Suffolk   July 2020



We were approached to specify a pump to boost hot water in a bungalow.

Pump World’s technical team recommended a Supergen 15SX - a cost effective, regenerative unit with a specially designed single impeller that aids the removal of air generated in the system. Low speed (1450 rpm) induction motor and anti-vibration rubber feet reduce transmitted noise. This pump is extremely quiet running and WRAS Approved. Supplied with 1.5 m mains cable and stainless steel braided hoses.

  Technically very helpful in understanding complex water flow problems. The pump was fitted this morning...impressively quiet...hot water now reaches the sink in one minute with full flow, previously it was 2 minutes 45 seconds with a slow flow! Thanks for all your help." 

- Jonathan, End User    

 

Kitchen Tap Boosting, Suffolk   July 2020



We were approached to specify a pump to boost hot water in a bungalow.

Pump World’s technical team recommended a Supergen 15SX - a cost effective, regenerative unit with a specially designed single impeller that aids the removal of air generated in the system. Low speed (1450 rpm) induction motor and anti-vibration rubber feet reduce transmitted noise. This pump is extremely quiet running and WRAS Approved. Supplied with 1.5 m mains cable and stainless steel braided hoses.

  Technically very helpful in understanding complex water flow problems. The pump was fitted this morning...impressively quiet...hot water now reaches the sink in one minute with full flow, previously it was 2 minutes 45 seconds with a slow flow! Thanks for all your help." 

- Jonathan, End User    

Domestic Property, Hampshire

Jun 22 2020
1
0

Domestic Property, Hampshire   May, 2020

We were approached to specify a complete system to boost cold water over 3 floors to 4 bathrooms. The water tank capacity needed to meet the demands of the full system operating for a period of 12 minutes without any recovery from the mains.

Pump World’s technical team quickly put together a combination of products that met the end user’s requirements for a quiet-running, energy efficient, high performance, and easily maintainable solution to low water pressure. This included the Smartpro 12 Plus booster pump, which can be controlled and monitored with your smartphone, two modular break tanks with insulation jackets, and a water conditioner to treat hard water coming in from the mains – all supplied via the end user’s local merchant.

  Nigel showed a wealth of experience and was very helpful in determining the solution for my property." 

- Simon, End User 

 

 

 

Domestic Property, Hampshire   May 2020



We were approached to specify a complete system to boost cold water over 3 floors to 4 bathrooms. The water tank capacity needed to meet the demands of the full system operating for a period of 12 minutes without any recovery from the mains.

Pump World’s technical team quickly put together a combination of products that met the end user’s requirements for a quiet-running, energy efficient, high performance, and easily maintainable solution to low water pressure. This included the Smartpro 12 Plus booster pump, which can be controlled and monitored with your smartphone, two modular break tanks with insulation jackets, and a water conditioner to treat hard water coming in from the mains – all supplied via the end user’s local merchant.

  Nigel showed a wealth of experience and was very helpful in determining the solution for my property." 

- Simon, End User    

 

Domestic Property, Hampshire   May 2020



We were approached to specify a complete system to boost cold water over 3 floors to 4 bathrooms. The water tank capacity needed to meet the demands of the full system operating for a period of 12 minutes without any recovery from the mains.

Pump World’s technical team quickly put together a combination of products that met the end user’s requirements for a quiet-running, energy efficient, high performance, and easily maintainable solution to low water pressure. This included the Smartpro 12 Plus booster pump, which can be controlled and monitored with your smartphone, two modular break tanks with insulation jackets, and a water conditioner to treat hard water coming in from the mains – all supplied via the end user’s local merchant.

  Nigel showed a wealth of experience and was very helpful in determining the solution for my property." 

- Simon, End User    

PHAM News, June 2020

Jun 11 2020
2
0

PHAM News   June, 2020

FAQs on how to get Mains Boosting right 

Boosting mains water pressure correctly requires research of the client’s property, understanding the client’s brief, a flexible attitude if that brief changes, and accurate calculation of normal and peak demand flow rates, friction losses, and more. Pump World offers answers to the frequently asked questions when it comes to achieving optimum results.

Click the article to read more.

 

PHAM News   June 2020



FAQs on how to get Mains Boosting right 

Boosting mains water pressure correctly requires research of the client’s property, understanding the client’s brief, a flexible attitude if that brief changes, and accurate calculation of normal and peak demand flow rates, friction losses, and more. Pump World offers answers to the frequently asked questions when it comes to achieving optimum results.

Click the article to read more.

 

PHAM News   June, 2020

FAQs on how to get Mains Boosting right

Boosting mains water pressure correctly requires research of the client’s property, understanding the client’s brief, a flexible attitude if that brief changes, and accurate calculation of normal and peak demand flow rates, friction losses, and more. Pump World offers answers to the frequently asked questions when it comes to achieving optimum results.

Click the article to read more.

 



 
telephone

01793 820142

Monday - Friday, 9am - 5pm

 

 



 
pump solve &

specification

Advice and recommendations

 

 

 



 
fast identification

email a photo

ID for direct or nearest match. 

 

 







about us 

Pump World's philosophy is to provide quality pump solutions that are energy saving and low on noise without compromising on performance. 

The Pump World team are here to help you put together the right boosting equipment to optimise your system. Our sister company, Smart Showers, sources the finest Italian shower design for a luxury bathroom experience.

Together, Pump World and Smart Showers provide an all-encompassing system solution - designed to suit you.

Pump World   A limited company, registered in England. VAT No: GB535638919.
Company Number : 02433506.  Registered At : Unit 11 Woodside Road, Swindon, SN3 4WA.

 

payment methods

           

Text/HTML